Daleys Turf have been contracted to install new turf being Nullarbor Couch at the Cotton Tree oval, we completed the job on Monday 14th February and with 12 weeks of after care programed it should be a first class surface for our local boys to win on. The field was laser levelled with falls for drainage, extra soil added, ammendents done to existing soil, brand new irrigation system with two very large tanks, new lighting and most of all turf was installed using the Maxi roll system. This field should be a first class sportsfield for all Sunshine Coast players to enjoy.
This Post Has 0 Comments